OPEN SESSION
Session chairs: Karel Rössler, Zdeněk Žižka
Open Session
SELECTION OF THE MOST SUITABLE ORGANISATIONAL MODEL FOR LONG TUNNELS
H. Ehrbar
Note: Invited Open Session speakers were not required to submit a full paper; therefore, the papers of some panelists are not listed here.
Presentations
PLANNING: INTRODUCTION + OVERVIEW HSR WORLDWIDE
A. Pigorini
PLANNING: TECHNICAL AND OPERATIONAL CONCEPT OF HIGH-SPEED RAILWAYS IN THE CZECH REPUBLIC
J. Merta
CONTRACTUAL ISSUES: SELECTION OF THE MOST SUITABLE ORGANISATIONAL MODEL FOR LONG TUNNELS
H. Ehrbar
CONTRACTUAL ISSUES: KEY CONTRACT FEATURES OF THE UK HIGH SPEED 2 PHASE 1 PROJECT
M. Knights
ENGINEERING DESIGN: HIGH-SPEED RAIL NETWORK TUNNELS IN POLAND – OVERVIEW AND CHALLENGES
M. Mitew-Czajewska
OPERATION: ASPECTS CONCERNING THE REAL OPERATIONAL AVAILABILITY OF LONG RAILWAY TUNNELS
G. Harer
OPERATION: ADVANCED EQUIPMENT, OPERATIONAL SAFETY AND MAINTENANCE FOR THE KORALM RAILWAY TUNNEL
F. Diernhofer