SESSION 4
Geotechnical investigation and monitoring
Session chairs: Dietmar Adam, Alexandr Rozsypal, Václav Veselý
Invited Lectures
LONG-TERM MEASUREMENTS OF ENERGY GEOSTRUCTURES AT THE TABORSTRASSE METRO STATION IN VIENNA
D. Adam, R. Markiewicz & A. T. Brunner
Oral Presentations
CURRENT STATUS OF THE DETAILED GEOTECHNICAL INVESTIGATION FOR THE BEROUN TUNNEL
P. Pícha, O. Krásný, P. Mazáč, P. Olišar, T. Pašek, J. Nedvěd & M. Zbořilová
RESULTS OF GEOTECHNICAL MONITORING OF THE HOMOLE TUNNEL CARRIED OUT BY THE CONTRACTOR
M. Kubiš, O. Krásný, P. Gaži, P. Karlín, V. Suchanová, J. Bažant & V. Nosek
CONSTRUCTION TBM TUNNEL – OPERATING DATA IN REAL TIME – RED LINE METRO AND GREEN LINE METRO IN TEL AVIV (ISRAEL)
P. Merlanti, A. Capobianco, E. Santucci, S. Gambula, G. Pratesi & M. Kalimyan
INSAR AS AN OPERATIONAL COMPONENT OF GEOTECHNICAL MONITORING: PRACTICAL APPLICATION FOR SUBWAY LINE D CONSTRUCTION IN PRAGUE
I. Hlaváčová, J. Kolomazník, J. Struhár & J. Bohátka
EXPLORATORY ADIT FOR THE BÍLÁ SKÁLA TUNNEL ON THE ROUTE OF THE PRAGUE CITY RING ROAD
J. Korejčík & Z. Žižka
Posters
EXPLORATORY ADIT AND RELATED INVESTIGATION ACTIVITIES IN THE EXCAVATED SECTION OF THE JAROV TUNNEL OF THE PRAGUE CITY RING ROAD
P. Bureš, L. Grünwald & J. Rout
GEOTECHNICAL MONITORING DURING THE CONSTRUCTION OF BARRIER-FREE ACCESS TO THE JIŘÍHO Z PODĚBRAD METRO STATION
M. Čermák, B. Pavelková & R. Morávek
PILOT ADIT FOR THE MALEŠICE TUNNEL
M. Hnilička & A. Veverka
CABLE DUCT EXCAVATION USING A MECHANISED SHIELD AT KOLÍN RAILWAY STATION – AUTONOMOUS GEOTECHNICAL MONITORING OF THE TRACK SYSTEM
M. Mixa, V. Petržilek & J. Košťál
OPTIMISING TUNNEL BLASTING: PRACTICAL APPROACHES TO VIBRATION CONTROL AND SAFETY IN UNDERGROUND WORKS
M. Cardu & C. Todaro